Hồ chứa nước phục vụ sản xuất

The system of small reservoirs, weirs and pumping stations in Gia Lai plays a role in regulating water for thousands of hectares of production. Most of these structures have been in operation for many years; some have deteriorated in the dam body and gates.

What to check before the rainy season

Prioritise inspection of the dam body, dam slopes, spillway and gates. The actual flood discharge capacity should be assessed against the design flow, and seepage at the dam toe should also be checked.

Pumping stations: minor maintenance avoids major damage

Cleaning trash screens, checking the electrical system and providing backup pumps are low-cost tasks that help avoid water loss at the most critical time.

  • Inspect dam body, spillway and gates
  • Assess flood discharge capacity based on actual flow
  • Maintain pumping stations and electrical systems before peak period

Partners interested in cooperation in this sector, please contact the HR and Administration Department via the hotline 0962 991 179 or email info@qdgl.com.vn.

Illustrative image: Saiphani02 (CC BY-SA 4.0), Wikimedia Commons.

Published on