In concentrated agricultural production areas such as Gia Lai, irrigation efficiency depends heavily on the on-farm canal network. Silted canals and collapsed embankment bunds cause water loss and prolong irrigation time, directly affecting the planting schedule.
Tasks to complete before the dry season
- Dredging the canal bed: remove mud, grass and waste to restore the flow cross-section.
- Reinforcing embankment bunds: backfill, compact and treat collapsed and leaking sections.
- Repairing culverts and regulating weirs: restore the opening/closing capability and flow control.
- Inspecting pumping stations: maintain machinery, pipelines and electrical systems before the peak period.
Economic efficiency of timely maintenance
Dredging and repair costs are usually small compared with the damage caused by water shortages or by having to pump multiple times. A clear canal helps reduce irrigation time, lower the pumping station’s electricity consumption, and limit conflicts over water sources among households sharing the same canal route.
Technically, the canal bed elevation should be surveyed before dredging to avoid excessive deepening that destabilises the banks; bank reinforcement materials should be selected to suit the local soil conditions, with scour protection measures at curved sections.
Quang Duc’s participation approach
Quang Duc participates in technical infrastructure work packages serving agricultural production, including canal dredging, embankment bund reinforcement, construction of access roads and ancillary works. The Company prioritises coordination with local authorities and cooperatives to organise construction by section of the route, limiting impacts on the crop season.