Gia Lai has good solar radiation and ample land availability, favorable conditions for solar power. However, project efficiency depends on many factors beyond radiation, from terrain and drainage to grid connection capacity.
Site preparation
The site should be leveled just enough to retain natural drainage and limit erosion. On sloping terrain, it should be divided into terraces with drainage channels along each terrace.
Operation and maintenance
Dust and weeds are two common causes of reduced output. A regular cleaning plan and inspection of wiring and inverters should be included from the design stage.
- Site levelling to retain natural drainage
- Drainage channels laid out along sloping terrain
- Solar panel cleaning and regular inverter inspection schedule