For large-scale agricultural projects or processing areas, access roads and site preparation are prerequisites for bringing equipment in. Delays or inadequate work often lead to repair costs many times higher.

Logical sequence

Survey topography and drainage first, then design the site-levelling elevation. The ground must be compacted in layers and its compaction checked before pouring concrete or spreading stone.

Access roads must withstand actual loads

Vehicles carrying materials and equipment are often heavier than ordinary vehicles. The pavement structure should be designed for construction loads, especially on steep sections and curves.

  • Survey drainage before designing elevations
  • Compact in layers and check subgrade compaction
  • Design the road structure for construction vehicle loads