For wind power and solar power projects, the power generation component usually receives the most attention. But to get electricity onto the grid, the project owner also has to build transmission lines, substations and ancillary works — a group of tasks that consumes considerable time and capital.
Associated infrastructure items
Besides the transmission line and substation, the project requires access roads to tower positions, equipment staging areas, tower foundations and a grounding system. This is a part in which local construction enterprises can participate.
Common risks
Slow site clearance, hilly terrain and the rainy season are the three common causes of delays to connection progress. The construction plan should make allowances for these factors.
- Construction of access roads to turbine positions
- Turbine foundations, earthing system and auxiliary works
- Coordinate site clearance by route section